Loading...
Year: 2019
Client: “BIM-SOLUTION” SRL
Final Beneficiary: Department of home affairs
Location: Chișinău City
Short description:
Detailed design refers to boiler house automation system based on natural gas boiler and solar panels.
Year: 2019
Client: “Salonix-Teh” SRL.
Final Beneficiary: “Apă Canal Chișinău” S.A.
Location: Chișinău City
Short description:
Reconstruction of waste water treatment plant represents major part technological equipment replacement, construction of new buildings and structures, construction of a new sludge treatment system and biogas system, the development of a new control, automation and SCADA system.
Detailed design was elaborated for the following compartments:
Year: 2020
Client: “UPCON” SRL.
Final Beneficiary: “PETROM-MOLDOVA” SRL .
Location: Chisinau city
Short description:
Full automation system design works for oil tank truck loading system, additive dosing system, gasoline disharge pump, vapor recuperation equipment
Year: 2021
Client: “Strabag” SRL
Final Beneficiary: “APASERV SATU MARE” S.A
Location: Satu Mare city, Romania
Short description:
Project provides construction of 3 new waste water treatment plants: mechanical and biological treatment water treatment system, sludge dewatering system, new control and automation system and SCADA.
Design works description:
- Electrical design works
- Automation design works
- Weak currents design works