Loading...
Year: 2021
Final Beneficiary: “Südzucker Moldova” S.A
Location: Drochia city
Short description:
The modernization consisted of replacing old PLC and expansion modules with a Siemens Simatic S7-1200 PLC, installing an HMI operator panel, developing new software for both sugar content measurement line and the contamination measurement line.
Basic equipement:
PLC and HMI panel - Siemens
Power and switching equipment - Siemens
Intermediate Relays – Schneder Electric
Terminals - Phoenix Contact
Switchgears - Tekpan
Year: 2022
Final Beneficiary: “Südzucker Moldova” S.A
Location: Drochia city
Short description:
The modernization consisted of replacing an obsolete power and control equipment for 2 beet cutting machines to a new control equipment with new software developing
Works description:
- Equipment dismounting works
- New equipment mounting works based on PLC Siemens Simatic S7-1200
- Automation panels assembly
- New control system mounting based on HMI operator panel
- New software developing
- Commisioning and testing works
Basic equipement:
PLC and HMI panel - Siemens
Power and switching equipment - Schneider Electric
Intermediate Relays – Schneder Electric
Terminals - Phoenix Contact
Year: 2022
Client: Joint Venture SADE-CGTH & VWS Romania
Final Beneficiary: “Apa-Canal Cantemir” S.A
Location: Cantemir city
Short description:
Project consists in monitoring system implementation for raw water pumping station. water treatment plant, outgoing treated water pumping station. Signal transmission in made with GSM modules. SCADA system is instaled in water treatment plane operator’s room.
Works description:
- Design works
- Switchgear assembly
- SCADA and PLC software developing
- Electrical works
- Commisioning works
Basic equipment:
PLC - Siemens
Power and switching equipment - Schneider Electric
Intermediate Relays – Schneider Electric
Terminals - Phoenix Contact
Switchgears - Tekpan